Continuity and IT Controls

Disaster Recovery Plan (DRP) and Recovery Procedures

We plan in advance which system comes back first after a disaster, cyber attack or infrastructure failure: recovery order, dependencies, technical runbooks, roles and communication. We compare the recovery time and data loss targets set by business units with the recovery time measured in testing and the data point that could actually be restored. Putting the written plan into operation in the infrastructure and testing it is carried out through our backup and disaster recovery infrastructure service.

DRP

Recovery orderRunbookRTO / RPO comparisonRecovery testClean backupDisaster recovery site

Service definition

What is a disaster recovery plan (DRP), and who is it for?

A disaster recovery plan (DRP) defines the technical and organizational steps to bring IT infrastructure and applications back into operation in a set order and within the target time after an outage. Identity infrastructure, network, storage, databases and applications depend on each other; that’s why the most critical decision in a DRP is “what comes back first”.

01

We don’t have a DR site; can a DRP be written?

Yes. The DRP is written around a restore-from-existing-backup scenario; if additional infrastructure is needed, it’s justified with the targets and a gap analysis.

02

Does a recovery test affect production?

Tests are planned in an isolated environment or an approved maintenance window; production isn’t touched without a plan.

03

Is a separate plan needed for ransomware?

Recovery after a cyber incident involves different steps (isolation, clean backup verification, identity infrastructure); it’s added to the DRP as an extra scenario.

04

Do you also set up the infrastructure?

The compliance side covers the plan and testing; infrastructure setup can be planned with the Eretek System Support team.

Project stages

How do we proceed?

01 / STAGE

Analysis

Systems, dependencies and targets are identified.

02 / STAGE

Strategy

The recovery method is chosen.

03 / STAGE

Documentation

The DRP and runbooks are written.

04 / STAGE

Test

A recovery test is carried out and the plan is updated.

Compliance and Audit

Know in advance in what order and how fast you’ll bring your systems back

Share your critical systems, backup infrastructure and RTO/RPO targets. Let’s scope the DRP and recovery test and prepare a proposal.