Sector-Specific and Specialized Compliance

Integrated TISAX, ISO 27001 and IATF 16949 Compliance Program

We organize shared evidence such as access reviews, supplier records and continuity tests together. We track ISO 27001, TISAX and IATF 16949 IT requirements against their own criteria. That way, each record shows in which scope and for which control it will be used.

TISAX

ISO 27001IATF 16949Shared control librarySingle risk methodologyIntegrated internal auditAudit calendar

Service definition

What is an integrated TISAX, ISO 27001 and IATF program, and who is it for?

An integrated compliance program meets frameworks with similar requirements through a single management approach. A concrete example: one access review record can at the same time be evidence for an ISO 27001 Annex A control, a VDA ISA identity and access management control and an ITGC access control. A cyber exercise report contributes to both IATF 6.1.2.3 and the TISAX business continuity requirement.

01

Are the audits combined too?

No; each framework has its own assessment body. What’s combined is the preparation and evidence foundation.

02

What about our existing teams?

The quality and IT teams work together; roles are clarified with a shared RACI.

03

Which system should we start from?

The most mature system becomes the backbone; building on it is faster than starting from scratch.

04

How long does the program take?

The initial integration is a project phase; after that, it runs continuously on an annual calendar.

Project stages

How do we proceed?

01 / STAGE

Mapping

The frameworks and current state are mapped.

02 / STAGE

Consolidation

The risk, document and evidence structures are combined.

03 / STAGE

Operation

The integrated calendar is run.

04 / STAGE

Audits

Each framework’s audit is entered with evidence mapped to its own criteria.

Compliance and Audit

Organize the shared evidence of three separate programs in a single library

Share your current certifications, customer requests and audit calendar. We’ll propose the scope and roadmap of the integrated program accordingly.