ISMS and ISO 27001

ISO 27001 Gap Analysis and Current State Assessment

We measure your policies, processes and technical controls against the requirements of ISO/IEC 27001:2022, through interviews, document review and evidence sampling. The gaps found turn into a prioritized roadmap.

Clauses 4–10 assessmentAnnex A control statusEvidence samplingMaturity scoreRoadmapEffort estimate

Service definition

What is an ISO 27001 gap analysis, and who is it for?

A current state and gap analysis assesses, with records and examples of practice, the difference between what the organization does today and what ISO 27001 expects. It isn’t a checklist marked “yes/no”. For each requirement, the existence, consistency and records of the practice are assessed separately. The output is a plan showing which work will be done, in what order and with how much effort.

01

Is a gap analysis the same as setup?

No. The analysis assesses the current state and gives a roadmap; closing the gaps is the job of the setup project.

02

Can it be done remotely?

Interviews and document review can be done remotely. We recommend a short site visit for physical security and on-site controls.

03

Do you give a score at the end?

Yes, a maturity score is given per clause and control. But the main output isn’t the score; it’s the prioritized gap list and the roadmap.

04

Is the cost of the gap analysis deducted from the next project?

Commercial terms are clarified at the proposal stage; the analysis outputs are used directly in the setup project.

Project stages

How do we proceed?

01 / STAGE

Preparation

A draft scope is shared and documents are requested.

02 / STAGE

Interviews

Function-based interviews and document review are carried out.

03 / STAGE

Sampling

Evidence is verified for selected controls.

04 / STAGE

Report and presentation

Findings, the roadmap and the effort estimate are presented to management.

Compliance and Audit

Start your ISO 27001 project from a measured starting point

We listen to your scope and current controls in a short meeting. Then we present a proposal that clarifies the method, sampling level and outputs.