We set up the ISMS from scratch. Scope and context analysis, risk methodology, risk treatment, the Statement of Applicability, policies and procedures specific to your organization, record infrastructure, internal audit and management review are tied together in a single cycle. The result: a system that’s ready for the certification audit and really works.

ISO/IEC 27001:2022

Amd 1:2024Clauses 4–10Annex A controlsRisk treatment planSoAInternal audit

Service definition

What is ISO 27001 ISMS setup, and who is it for?

Setting up an ISMS means designing and putting into operation a management system that answers these questions: Which information assets will be protected, in what scope, with which risk acceptance criteria and with which controls? Who owns each control, how is it measured, when is it reviewed? We set up the system end to end, both in organizations with no documents at all and in companies with scattered policies. The goal isn’t a folder filled for audit day. The goal is a mechanism that keeps working after the audit too.

01

How long does an ISO 27001 setup take?

The duration depends on the breadth of the scope, the number of locations, the maturity of existing controls and the time the internal team can set aside. In the proposal, we present a stage-by-stage schedule based on the result of the current state analysis; we don’t commit to a fixed duration.

02

Does Eretek carry out the certification?

No. Eretek provides setup, documentation and preparation consulting. The certification audit is carried out by an accredited certification body; the outcome isn’t guaranteed.

03

Where do we start if we have no documents at all?

We start with context analysis and scope. The document set is written after the risk assessment, based on the controls that will really be applied. No documents are produced that won’t be used.

04

Who will run the system after setup?

The system is handed over to your internal team and the necessary training is given. If internal resources aren’t enough, support continues through outsourced ISMS responsibility or a periodic consulting model.

Project stages

How do we proceed?

01 / STAGE

Kickoff and scope

The project team, schedule, context analysis and scope statement are clarified.

02 / STAGE

Risk and control design

The methodology, risk register, risk treatment plan and SoA are prepared.

03 / STAGE

Documentation and rollout

Policies, procedures and records are written; controls start operating in practice.

04 / STAGE

Measurement and internal audit

Evidence accumulates; internal audit and management review are carried out.

STAGE 05

Certification preparation

Corrective actions for internal audit findings are completed; the certification body is chosen and the audit day is planned.

Compliance and Audit

Let’s plan ISMS setup from scope to the certification audit

We listen to your organization’s size, locations, IT setup and target date. Then we prepare a project proposal covering stages, responsibilities and deliverables.

We set up ISO 27001 ISMS programs with organizations across Türkiye; most of the work takes place online, and we work at the organization’s premises when site observation or internal audits are needed. Our service areas.