TISAX and Automotive

IATF 16949 Cyberattack and Contingency Exercise

For cyber incidents that could affect production, we prepare the contingency plan, customer communication, alternative working, recovery and return-to-production steps. In exercises, we record what was tested, the measured result and the improvement actions. Tabletop scenarios and restore-from-backup tests are the exercise methods Eretek uses. IATF 16949 6.1.2.3 requires the effectiveness of the plans to be tested periodically; the organization chooses the method based on risk.

6.1.2.3 · SI 3

Tabletop exerciseRestore testAlternative workingCustomer notificationLessons learnedAnnual review

Service definition

What is an IATF 16949 cyber attack exercise, and who is it for?

An exercise measures whether the contingency plan really works, using a controlled scenario. In the tabletop part, the decision flow, roles and communication are tested; in the technical test, recovery from backup and the alternative way of working are actually tried. The measured times are written into the exercise report and used to update the plan. If the scenario includes production stopping without the normal shutdown steps being followed, verifying that the product meets the customer specification on return to production is also covered.

01

Does the exercise stop production?

A tabletop exercise doesn’t affect production. Technical tests are done in a test environment or in an approved maintenance window.

02

How often should it be done?

6.1.2.3 asks for two separate things: contingency plans are tested periodically; and the plans are also reviewed at least once a year by a multidisciplinary team that includes top management. The clause doesn’t set a fixed frequency for testing. The organization sets the exercise frequency based on the risk of disrupting the customer.

03

Is the exercise report enough for the IATF audit?

Not on its own; together with tracking of improvement actions and the plan update, it forms the evidence of effectiveness testing. The auditor decides whether it’s sufficient.

04

Is customer notification tested too?

Yes; the notification decision, content and channel are part of the scenario, but no message is sent to a real customer.

Project stages

How do we proceed?

01 / STAGE

Preparation

The scenario, participants and rules are set.

02 / STAGE

Exercise

The tabletop and technical tests are carried out.

03 / STAGE

Assessment

Observations and measurements are analyzed.

04 / STAGE

Improvement

Improvement actions and the plan revision are completed.

Compliance and Audit

Test your cyber attack scenario with a controlled exercise before the audit

We listen to your critical production processes and systems and propose a realistic scenario, participant list and record structure.