TISAX and Automotive

VDA ISA Gap Analysis and Maturity Assessment

We compare the maturity level declared for each control in the organization’s self-assessment with current practice and records. We gather the gaps, owners and order of completion in a work plan.

VDA ISA

Maturity 0–5Target level 3Control mappingSelf-assessmentEvidence statusPrioritization

Service definition

What is a VDA ISA gap analysis, and who is it for?

A current state analysis measures today’s maturity level for each control in the question catalog used in TISAX and turns the difference from the target into work packages. Maturity doesn’t look at whether a practice exists. What it looks at is this: is the process defined, documented, applied, and is its effectiveness monitored?

01

Does a gap analysis replace the TISAX assessment?

No. A current state analysis is preparation work. The TISAX label depends on the result of the assessment carried out by an ENX-approved audit provider.

02

Which ISA version is it done with?

According to the date of your assessment order: ISA 6 for 2026 orders, ISA2027 for orders on or after 1 January 2027. The differences between the two can be reported separately.

03

Are prototype protection controls included?

Yes, if prototype protection is among your assessment objectives; an on-site review of the relevant areas is recommended.

04

Are TISAX vs ISO 27001 differences shown separately?

If you have ISO 27001 certification, shared and differing controls are marked separately in the report.

Project stages

How do we proceed?

01 / STAGE

Preparation

Objective, scope and document collection.

02 / STAGE

Interviews

Function-based catalog interviews.

03 / STAGE

Sampling

Evidence checks on selected controls.

04 / STAGE

Report

Maturity table, work plan and management presentation.

Compliance and Audit

Let’s measure your VDA ISA maturity and base your TISAX plan on real data

Share your assessment objectives and locations; let’s prepare a proposal for a control-based maturity measurement and work plan.